Wavebreaker AB has started the installation of the first order. The assembly of the modules is done on a new noise barrier made of aluminium elements between steel pillars next to a high-traffic railway corridor designed for 200 km/h. The link below you find reports from both our local storage and from the installation site.
Youtube: http://www.youtube.com/@wavebreaker-mutestrafficnoise
July 2024



